| Georgia construction law compendium prepared by Wei's loan indebtedness. During that time, wei could not access the construction payments B&G had been making into wei s account in order to pay its subcontractors. As such, B&G paid all of wei's subcontractors individually 66.01 Kb. 1 | read |
| Section 15010, Mechanical Provisions (1) Related Documents A. Contract requirements of Division 1 Specification Sections, apply to work of this section 0.53 Mb. 9 | read |
| Cargo arrival deadlines Consignment instructions for all airway bills, ocean bills of lading and commercial invoices 51.35 Kb. 1 | read |
| 2006 Storms Special Report Two separate storms July 19 and July 21 plunged much of the St. Louis area into darkness. For some, the outages lasted a week or more Report 68.08 Kb. 1 | read |
| Contractors Rules & Regulations A minimum of five (5) days prior to starting construction, the contractor shall contact the landlord's property manager to arrange a Pre-Construction Meeting at the site 196.27 Kb. 2 | read |
| Engineering specifications Clean Agent Fire Extinguishing utilizing hfc-227ea or branded fm200 agent manufactured by Dupont ™ at 360 psi with the mx-320 Intelligent Addressable Fire Alarm System 99.73 Kb. 1 | read |
| Control system engineering specifications Total Flood” Clean Agent Fire Suppression System with automatic detection and control. The work described in this specification includes all engineering, labor, materials, equipment and services necessary, and required 86.08 Kb. 1 | read |
| Specification section 16710 multimedia systems Index – List all primary headers and subheadings 01, 03, etc with titles and pages 109.26 Kb. 1 | read |
| Introduction to repair and maintenance obligations in leases In general, a Landlord wants to limit its maintenance and repair obligations in a lease to structure, foundation, roof and Common Areas and the Landlord wants to be able to pass through any costs incurred to maintain 16.71 Kb. 1 | read |